Kentucky Mechanics Lien
Deadlines & Filing Rules

Every notice, deadline, and recording requirement for a Kentucky construction lien, drawn from KRS §§ 376.010, 376.080, 376.090, 376.220 and the same rule engine that calculates deadlines for our filing customers.

Kentucky lien rules at a glance

Preliminary notice
Not required to preserve lien rights
Lien filing deadline
within 6 months after last furnishing labor or materials
Notarization
Required
The lien claim must be sworn to under oath
Where to record
County clerk where the property sits
E-recording
Available in participating counties
Enforcement deadline
Within 1 year after the lien is recorded

Who can file a mechanics lien in Kentucky

Lien rights depend on where you sit in the contracting chain. Tenant-ordered work can reach the owner's interest in Kentucky only where the owner consented to or required the improvements. Owner-occupied residential projects carry extra notice requirements in Kentucky; missing them can cost the lien entirely.

Claimant Lien rights in Kentucky
General contractor (direct contract with the owner) Yes
Subcontractor (hired by the general contractor) Yes
Sub-subcontractor (hired by a subcontractor) Yes
Material supplier to the owner Yes
Material supplier to the general contractor Yes
Material supplier to a subcontractor Yes

Kentucky mechanics lien deadlines

Not required to preserve lien rights. Kentucky requires a notice of intent to lien before the lien itself is recorded, served at least 120 days ahead of filing.

Calculate your Kentucky deadlines

Enter your role and project dates to turn the rules below into calendar dates. For other states, use the mechanics lien deadline calculator.

Project type

Choose your role to see which dates you need.

These dates come from the same rules our lien filing service uses. They are not moved for weekends or holidays. Deadlines turn on facts specific to your project. Confirm with counsel before relying on them.

Notice of intent to lien

The final warning before a lien is recorded.

Who Project type Deadline
All claimants All projects At least 120 days before filing the lien

Mechanics lien filing deadline

The last day the lien can be recorded against the property.

Who Project type Deadline
All claimants All projects Within 6 months after last furnishing labor or materials

Recording and enforcing a Kentucky lien

Recording the lien

Record with the county clerk where the property sits. Electronic recording is available in participating counties. The lien must be notarized. The lien claim must be sworn to under oath.

After recording

A copy of the recorded lien must be served on the property owner within 7 days of recording. To keep the lien alive it must be enforced by lawsuit within 1 year after the lien is recorded.

Wrongful lien exposure

Filing a knowingly false lien in Kentucky can carry criminal penalties as well as civil liability. Filing a lien the filer knows or should have known is forged, groundless, materially misstated or false is a Class D felony for a first offense (KRS 434.155); an unintentional misstatement is an affirmative defense. Separately, a lienholder who fails to release a satisfied lien within 30 days faces per-day damages and fees after written notice (KRS 382.365).

Practitioner notes for Kentucky

In Kentucky, a subcontractor or supplier who did not contract directly with the owner must send the owner written notice of its intention to hold the property liable, with the amount it will claim. The deadline runs from the last day it furnished labor or materials: within 120 days on claims over $1,000 and within 75 days on smaller claims (KRS 376.010(4)). On an owner-occupied single or double family home, the notice is due within 75 days, and the lien does not cover amounts the owner paid before receiving it (KRS 376.010(5)). Every claimant must file a sworn lien statement with the county clerk where the property is located within 6 months after last furnishing. A copy must be mailed to the owner within 7 days after filing, or the lien is dissolved (KRS 376.080). A suit to enforce must be filed within 12 months after the statement is filed (KRS 376.090). For leases signed after June 29, 2023, when a tenant orders work under an agreement with the landlord, the lien also reaches the landlord's interest unless the lease expressly excludes it (KRS 376.010(3)). Knowingly filing a groundless or false lien is a felony (KRS 434.155). A paid lien must be released within 30 days, and an owner can recover daily damages and fees if it is not (KRS 382.365). The overcharge damages rule in KRS 376.220 applies to liens on public project funds. Lease situations vary, so confirm with counsel when the work is for a tenant.

These notes summarize the statute as we read it.

Statutory sources: KRS §§ 376.010, 376.080, 376.090, 376.220. Read the Kentucky lien statute. Deadlines turn on facts specific to your project. Confirm with counsel before relying on them.

File your Kentucky mechanics lien

We calculate the Kentucky deadlines from your project dates, prepare the lien on the correct form, and handle recording. Self-serve from $99, or full service with recording and notices handled for you from $299.

Kentucky mechanics lien FAQ

How long do I have to file a mechanics lien in Kentucky?
The Kentucky lien must be recorded within 6 months after last furnishing labor or materials. The same deadline applies to every claimant.
Do I need to send a preliminary notice in Kentucky?
No. Kentucky does not require a preliminary notice to preserve lien rights, although sending one is still an effective way to get paid before a lien becomes necessary.
Does a Kentucky mechanics lien need to be notarized?
Yes. The lien must be notarized before it is recorded. The lien claim must be sworn to under oath.
Where is a mechanics lien filed in Kentucky?
With the county clerk where the property sits. Electronic recording is available in participating counties, which typically cuts the turnaround to a day or two.
How long is a Kentucky mechanics lien valid?
A Kentucky lien must be enforced through a foreclosure lawsuit within 1 year after the lien is recorded. If no suit is filed by then, the lien expires and can no longer be used to force payment.
Is a notice of intent to lien required in Kentucky?
Kentucky requires a notice of intent to lien before the lien itself is recorded, served at least 120 days ahead of filing.
Can a subcontractor file a mechanics lien in Kentucky?
Yes. Subcontractors have lien rights in Kentucky, and so do sub-subcontractors.